News|23.11.2023

New PV system in Conthey

Our first photovoltaic system was commissioned in 2012 - the existing PV network has now been expanded by 3,600 m2 to a total of 77,000 m2 in October 2023. Over 2,100 hours of sunshine now provide even more power in the Galliker network every year.

New PV system in Conthey

The new system in Conthey (VS) has an output of almost 785 kWp. Combined with the second-highest sunshine duration in Switzerland, which Valais can boast, this provides plenty of power. Valuable energy, which we at Galliker can use optimally for the logistics building in Conthey, but also for the e-charging stations already installed for our electric trucks, whose fleet is also being continuously expanded.

As of November 2023, 36 e-trucks are on the road between our branches every day - thanks to the power of the solar system, we are opening up a new charging option that is powered by renewable energy. In this way, we bring the Valais sun as energy directly onto the road and can continue to MOVE BIG THINGS in a clean and sustainable way. All in line with our long-term green logistics strategy.

More articles

New PV system in Conthey
News|15.06.2026

Galliker is accompanying the Swiss national powerchair hockey team

When logistics meets passion, extraordinary stories unfold. During the 2026 Powerchair Hockey World Championship in Finland, Galliker had the opportunity to support the Swiss national team on its journey to the international tournament, making a significant contribution behind the scenes. The project was initiated by the Swiss Paraplegic Association in Nottwil, whose Wheelchair Sports Switzerland division recognized the national team’s needs early on and proactively initiated the collaboration with Galliker.

Learn more
New PV system in Conthey
News|11.06.2026

When children look at a truck from a completely new perspective

On June 10, together with FrauenForumPlus Altishofen, we welcomed a total of 31 children aged 6 to 13 to a special afternoon with us. The focus was on a topic that is particularly important to us as a transport company: the safety of children in road traffic.

Learn more
New PV system in Conthey
News|13.05.2026

Opening ceremony of the Galliker Logistics Center 2 in S. Antonino

The official opening of the new Logistics Center 2 at the Ticino site in S. Antonino took place on 13 May 2026. The invited guests - including Fabio Regazzi, Member of the Council of States of the Canton of Ticino - were given the opportunity to get to know the modern and sustainable building and the associated logistics processes and services. Exactly 15 years after the first logistics center went into operation, Galliker is expanding its capacity in southern Switzerland by around 13,279 m² in response to the continuously increasing demand for specialized logistics space along the strategically important north-south axis.

Learn more