Infrastructure|20.02.2023

Two more Galliker photovoltaic systems connected to the grid

Since the beginning of February 2023, 2 more photovoltaic systems have been producing electricity on our roofs in Altishofen. With the systems on Logistics Center 2 (994 kWp) and Logistics Center 3 (919 kWp), the amount of electricity we produce annually across Switzerland has increased to over 13,800 MWh.

Two more Galliker photovoltaic systems connected t...

This means that we already produce 40% of our total electricity consumption in Switzerland ourselves. Green, clean and sustainable! The next two plants are already planned and will soon be under construction. More will follow. This means that Galliker will always be able to meet the increasing demand for electricity from the growing fleet of e-trucks.

More articles

Two more Galliker photovoltaic systems connected t...
Human Resources|13.06.2025

CSR Report 2024/2025: now online

We are pleased to present our CSR Report 2024/2025. As a family business, we have been consciously committed to sustainability for many years. For us, sustainability means acting responsibly and consciously in all our activities and business areas, thinking long-term and treating the environment, customers, partners and employees with respect.

Learn more
Two more Galliker photovoltaic systems connected t...
Mobility|04.06.2025

Galliker strengthens sustainable future with fully electric truck in Belgium

Since March 31, 2025, the fleet of the company Galliker has been expanded by another vehicle with an environmentally friendly drive. At the international headquarters in Liège (Belgium), a Volvo FH Electric has been integrated - a fully electric truck with an impressive output of up to 600 kW and a range of around 300 kilometers. The vehicle with the internal number 1.010 is used daily for short-distance operations in the port area of Ghent, where it demonstrates its strengths as a sustainable means of transportation.

Learn more
Two more Galliker photovoltaic systems connected t...
Infrastructure|28.05.2025

Starting signal for Zero Emissions Network

Wednesday 28.05.2025 will probably go down in the history books of the Galliker Group. It is considered the official starting signal for the "Zero Emissions Network" project

Learn more
Galliker Transport AG

Förderverein Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2025 Galliker Transport AG
© 2025 Galliker Transport AG